Pre-load contactor shaft

PROBLEM ENCOUNTERED

One of the pieces of electrical equipment had a shaft with a threaded section on which two nuts had to be screwed: an M4 square nut and an M4 hexagonal nut. When the M4 hexagonal nut was screwed on, the first patch was damaged.

ANALYSIS

To maintain the integrity of the two patches, it was necessary for the M4 hex nut to be temporarily positioned between the two pre-coated areas.

GLOBAL LINKING SYSTEM SOLUTION

Soprima pre-coated prototype parts with two 3M2510 patches to ensure strong braking.

The solution with a pre-assembled nut ensured that the first patch was not damaged and the customer approved this solution when the electrical equipment was assembled.

En poursuivant votre navigation, vous acceptez l’utilisation des cookies à des fins de services et mesure d’audience. Pour obtenir plus d’informations sur les cookies, cliquez-ici

Les paramètres des cookies sur ce site sont définis sur « accepter les cookies » pour vous offrir la meilleure expérience de navigation possible. Si vous continuez à utiliser ce site sans changer vos paramètres de cookies ou si vous cliquez sur "Accepter" ci-dessous, vous consentez à cela.

Fermer